Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
18禁无遮挡羞羞污污污污网站| 成人黄网站片免费视频| 欧美熟妇XXXXX欧美老妇不卡| 把腿张开开被添死去活来| 人妻精油按摩bd高清中文字幕| 精品午夜福利在线观看| 熟妇人妻av无码一区二区三区| 国产又粗又猛又爽又黄的a片小说| 免费a级毛片在线播放 | 色狠狠一区二区三区香蕉| 精人妻无码一区二区三区 | 警察被两个混混脱裤玩j视频| 国产精品成人一区二区三区| 被夫の上司持久侵犯日本| 性色av无码| 性色国产成人久久久精品一区二区| 51视频国产精品一区二区| 日韩乱码人妻无码系列中文字幕| 亚洲AV无码不卡| 国精无码欧精品亚洲一区 | 日本japanese丰满少妇| 亚洲精品一区二区| 花蝴蝶免费视频直播高清版| 欧美性xxxx极品少妇| 好男人在线社区www在线影院| 免费久久人人爽人人爽av| 你的东西太大了我装不了| 少妇把腿扒开让我爽爽视频| 中文字幕无码他人妻味| YOUJIZZCOM中国熟妇| 免费在线观看成人电影| 年轻的朋友4免费观看韩剧| 老司机午夜福利视频| 国产毛多水多做爰爽爽爽| 999国产精品999久久久久久| 国产亚洲一区二区手机在线观看| 欧美人与善交大片免费看| 国产精品无码专区| 亚洲国产精品久久久久久无码 | 粗长灼热快速捣出白沫h| 亚洲不卡中文字幕无码|